HOME / FAQ
  • How long does it take to get a reply after we send you an enquiry?

    We will get back to you within 2 hours of receiving the enquiry during working days.

  • Are you a direct manufacturer or a trading company?

    We are a factory and we also have our own international trade department, we produce and sell our own products.

  • Where are your goods mainly exported to?

    Our products are mainly exported to Europe, Southeast Asia, Dubai, Italy, Saudi Arabia, and dozens of other countries.

Our quality control process
  • STEP1

    Raw material procurement and acceptance inspection For the core components such as the spring tube, joints, casings, screws, and pointers, verify the materials, dimensions, and precision to ensure they meet the design standards.

  • STEP2

    Production process control During key processes such as part processing, welding assembly, dial printing, etc., sampling inspection points are set up to monitor dimensional errors,including sealing performance, argon arc welding techniques, etc.

  • STEP3

    Unfinished product After assembly,conduct an initial pressure test, check sensitivity of the pointer, ensure there is no jamming ,and identify assembly defects.

  • STEP4

    Finished Product Accuracy Calibration Use ISO 9001-compliant standard pressure sources (such as piston pressure gauges) for multi-point calibration, compare the indicated value errors, and recalibrate or scrap the products that are out of tolerance.

  • STEP5

    Environmental reliability testing Conduct pressure withstanding tests, air tightness tests, vibration tests, and high-low temperature aging tests to verify the product stability under harsh working conditions.

  • STEP6

    Appearance and marking inspection Verify the accuracy of dial scales, trademarks, measuring ranges, precision grades and thread dimensions, and check the casing for scratches and corrosion.

  • STEP7

    100% finished product inspection and packaging Each pressure gauge undergoes 100% full inspection, then moves to packaging area for consolidated packing and shipment. 1 gauge per small carton; 20-40 pcs per large carton.

  • STEP8

    After-Sales service tracking Carry out after-sales service tracking for equipment that has left the factory and promptly handle customer feedback issues and opinions to ensure the stability and reliability of the equipment .